Cape Henry Multiple Buildings Roof Replacements

Description: Removal and reinstallation of shingle roofs and all associated flashing and perform asbestos abatement where needed at Quarters B and Quarters C. New standing seam roofs and flashing were installed after the existing shingles were removed at OU1, OU2 and OU3. New standing seam roofs and associated flashings were installed at OG1, and OI1. The existing roof was removed down to the deck at the Pilot House location, and a new SBS modified roof system was installed, along with all associated flashings and a new stainless steel 2 piece saw cut reglet.