Custom Tag: roofers

Bldg 1540 Roof Replacement – Ft. Stewart

Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide Replace Roof on Bldg 1540.  All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes.  The work includes, but is not necessarily restricted to, the following items. Removal of existing roofing material Install of… Read more »

Ivor Dental Roof Repair

All pipes cleaned, patched and flashed. 120 LF of damaged stripping covered with new EPDM. Front Porch roof cleaned and coated. New coping fabricated and installed around the perimeter of main building. New piece of metal installed at transition of porch roof and main roof.

CDI Marine Roof Repair

Investigation and repairs to the perimeter of the roof. Roof membrane at perimeter, Coping laps and penetrations were sealed with one part liquid applied flashing.

Cape Henry Multiple Buildings Roof Replacements

Description: Removal and reinstallation of shingle roofs and all associated flashing and perform asbestos abatement where needed at Quarters B and Quarters C. New standing seam roofs and flashing were installed after the existing shingles were removed at OU1, OU2 and OU3. New standing seam roofs and associated flashings were installed at OG1, and OI1. The existing roof… Read more »

SP-367 Roof Replacement

Description: This project included replacing the existing built-up roofing system on high and low roof areas including rigid insulation, wall and equipment flashings, roof drain strainers and clamping rings, gutters and downspouts with a fully adhered modified bitumen roofing system, and a tapered system on one area of the low roof. The existing materials contained asbestos and were… Read more »

Beach Quarters Roof Replacement

Description: This project included the removal of the  existing roof down to existing deck, and disposal of properly off site. TST Roofing install 2ply modified bitumen roof and all associated flashings as specified by The Garland Company. The existing high wall EPDM flashing and coping to remain, and TST Roofing installed a new reflective coating system… Read more »

SDA-211 Roof Replacement

Description: This work includes a roof replacement at SDA-211, a single-story warehouse in the DLA warehouse district that has a low-slope high-bay roof flanked by two lower bay roofs along the long axis of the facility. Since its initial construction in the 1940s, the facility roof has been replaced several times, the most recent which… Read more »

Greenflash Brewery

Description: 1. Furnish and install a mechanically fastened 60 mil White Carlisle TPO roof system over 2 layers of 2.6” rigid insulation to achieve a minimum R-30 and all associated flashings and accessories as specified by roofing manufacturer. 2. Provide tapered insulation to create crickets as indicated. 3. Provide and install 040 Kynar coated aluminum… Read more »